VISUAL GUIDE

Know where to tap before the shift gets busy.

Follow the pictures below. You can start without an account, and the current tools save information only in this browser.

PATH 01

Track a live shift

Use this path when production is running and you need to capture lost time while it is still fresh.

STEP 1

Open Floor Mode

From the home page, tap the blue Start a live shift button. You can also choose Floor Mode from the top menu.

Go to Floor Mode →
Home page with Start a live shift highlighted
The blue button takes you directly to the live tracker.
STEP 2

Choose the cause and start the timer

Select Equipment, Materials, Staffing, Changeover, Cleaning, Quality, Waiting or Other. Tap Start downtime when work stops. Tap Stop & save when production resumes.

Quick tip: If the event already ended, enter the minutes manually instead.

Floor Mode with Equipment and Start downtime highlighted
Pick the cause first so the event is categorized automatically.
STEP 3

Finish the shift and assign the fix

Tap Finish shift to save the summary. Shift History ranks recurring causes. Open Corrective Actions and give the most important fix one owner and one due date.

Shift History leading to a corrective action with an owner and due date
Workminute helps turn the biggest repeated loss into a clear follow-up.

PATH 02

Use a calculator or builder

Choose All Tools when you already know the question you need answered.

YOUR FIRST SHIFT

A simple way to begin today

  1. 1

    Open Floor Mode on the phone you will use.Enter the area or line and choose the shift.

  2. 2

    Record every stop longer than your team’s chosen limit.Consistency matters more than perfect detail.

  3. 3

    Finish the shift and review the top cause.Do not try to fix every category at once.

  4. 4

    Create one corrective action.Add an owner, due date and a clear result to verify.

Start your first shift